508
508
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 508
favorite 0
comment 0
The final major components of Japan Aerospace Exploration Agency's Kibo laboratory arrived at NASA Kennedy Space Center's Shuttle Landing Facility from Japan on Sept. 24. The Kibo Exposed Facility and the Experiment Logistics Module Exposed Section will fly on space shuttle Endeavour's STS-127 mission to the International Space Station. Endeavour is targeted to launch May 15, 2009.
Topics: What -- Japanese Experiment Module (Kibo), What -- Space Shuttle Orbiter, What -- STS-127, What --...
286
286
Jun 10, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 286
favorite 1
comment 0
STS-119 Landing
Topics: STS 119, Shuttle
442
442
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 442
favorite 0
comment 0
Space shuttle Atlantis was removed from its external fuel tank and solid rocket booster stack and rolled back to its Orbiter Processing Facility at NASA's Kennedy Space Center in Florida, to await launch of its STS-125 mission to NASA's Hubble Space Telescope. The launch date is under review.
256
256
Jun 19, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 256
favorite 0
comment 0
Following rollout of space shuttle Endeavour from the Vehicle Assembly Building to Launch Pad 39B on April 17, two shuttles were on the launch pads at the same time at NASA's Kennedy Space Center, Fla. Shuttle Atlantis already had been moved to Launch Pad 39A. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during Atlantis' upcoming mission to upgrade NASA's Hubble Space Telescope. With the space shuttle fleet set for retirement in 2010, this is...
166
166
Jul 25, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 166
favorite 0
comment 0
On Launch Pad 39B at NASA's Kennedy Space Center in Florida, a crane removes the lightning mast from the fixed service structure. The mast was used to protect the space shuttle from lightning while at the pad. The new lightning protection systems being built for the Constellation Program and Ares/Orion launches allows for the taller height of the Ares 1 rocket compared to the space shuttle. Pad 39B will be the site of the first Ares vehicle launch, the Ares 1-X test flight, that is targeted for...
Topics: What -- Space Shuttle Orbiter, What -- Constellation, What -- Ares Launch Vehicles, Where --...
61
61
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 61
favorite 0
comment 0
STS-127 Discovery Payload CEIT
Topics: What -- STS-127, What -- Discovery
269
269
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 269
favorite 0
comment 0
In the Parachute Refurbishment Facility at NASA's Kennedy Space Center, senior aero composite technicians pack a colorful main parachute for use on the Ares 1-X rocket test flight. To understand the colossal size of the Ares chutes, imagine a cluster of three brightly colored canopies that cover more than two acres and are 325 feet long from end-to-end. Kevlar makes these new parachutes stronger and lighter than their nylon predecessors. Although the cute is bigger, it still fits into the...
Topics: What -- Ares Launch Vehicles, What -- Opportunity, Where -- Kennedy Space Center (KSC)
65
65
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 65
favorite 0
comment 0
STS-127 Endeavour CEIT-Jem Exposed Facility
Topics: What -- STS-127, What -- Endeavour, What -- Japanese Experiment Module (Kibo)
632
632
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 632
favorite 1
comment 0
Following rollout of space shuttle Endeavour from the Vehicle Assembly Building to Launch Pad 39B on April 17, two shuttles were on the launch pads at the same time at NASA's Kennedy Space Center, Fla. Shuttle Atlantis already had been moved to Launch Pad 39A. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during Atlantis' upcoming mission to upgrade NASA's Hubble Space Telescope. Atlantis is targeted to launch May 12. With the space shuttle fleet set...
Topics: What -- Space Shuttle Orbiter, What -- Endeavour, What -- Atlantis, What -- Hubble Space Telescope...
148
148
Jul 27, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 148
favorite 0
comment 0
Astronauts (STS-130) George Zamka and Kathryn Hire in promo for CBS Sports. NCAA Army vs. Navy, 3 takes.
Topics: Who -- Kathryn Hire, What -- STS-130
1,918
1.9K
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 1,918
favorite 1
comment 0
VAB Doors Opening with Time Lapse
234
234
Jul 25, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 234
favorite 0
comment 0
NASA's Kennedy Space Center and Lockheed Martin Corp. hosted a ceremony on Jan. 26 to mark the completion of renovations to the historic Operations and Checkout Building high bay for use by the Constellation Program. Originally built to process space vehicles in the Apollo era, the building will serve as the final assembly facility for the Orion crew exploration vehicle.
Topics: What -- Constellation, What -- Orion, Where -- Kennedy Space Center (KSC)
57
57
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 57
favorite 0
comment 0
Fairing Installation
Topic: What -- GOES-O
285
285
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 285
favorite 2
comment 0
Kennedy Space Center and Cape Canaveral Weather and Beauty Shots
Topic: Where -- Kennedy Space Center (KSC)
259
259
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 259
favorite 0
comment 0
NASA is a step closer to the first test flight of the rocket that will send humans on their way to the moon as part of the agency's Constellation Program. The simulated crew module and launch abort system, whcih will complete the nose of the Ares 1-X rocket, arrive at NASA's Kennedy Space Center, Fla., Jan. 28. The flight will be an important step towards verifying analysis tools and techniques needed to develop Ares 1, NASA's new crew launch vehicle.
Topics: What -- Moon, What -- Constellation, What -- Ares Launch Vehicles, Where -- Kennedy Space Center...
131
131
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 131
favorite 0
comment 0
Ares 1-X Crew Service Module Fit Check
Topic: What -- Ares Launch Vehicles
162
162
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 162
favorite 0
comment 0
Ares 1-X Parachute Packing
Topic: What -- Ares Launch Vehicles
159
159
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 159
favorite 0
comment 0
Ares 1-X Parachute Install
Topic: What -- Ares Launch Vehicles
186
186
Aug 21, 2009
08/09
by
NASA/Kennedy Space Center
movies
eye 186
favorite 0
comment 0
The full-scale mock-up of NASA's Orion crew module is being tested in the water off the coast of Kennedy Space Center in Florida the week of April 6. The spacecraft mock-up traveled from the Naval Surface Warfare Center's Carderock Division in Bethesda, Md., to Kennedy. The goal of the operation, dubbed the Post-landing Orion Recovery Test, or PORT, is to determine what kind of motion astronauts can expect after landing, as well as outside conditions for recovery teams.
Topics: What -- Orion, Where -- Kennedy Space Center (KSC), Where -- Florida
89
89
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 89
favorite 0
comment 0
Attach Solid Rocket Motors to Delta IV
Topic: What -- GOES-O
53
53
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 53
favorite 0
comment 0
Goes-O Thermal Blanket Inspection and Space Craft Rotate to Vertical
Topic: What -- GOES-O
310
310
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 310
favorite 0
comment 0
The first major flight hardware of the Ares 1-X rocket arrived in Florida on Nov. 3 to begin processing for its launch in 2009. The upper stage simulator arrived at Port Canaveral by ship. The flight hardware was off-loaded from the barge and taken to high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center. The upper stage simulator is made up of eleven individual components which were designed and manufactured by NASA's Glenn Research Center in Cleveland. They represent the...
Topics: What -- Ares Launch Vehicles, Where -- Florida, Where -- Kennedy Space Center (KSC), Where -- Glenn...
322
322
Jul 25, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 322
favorite 0
comment 0
On March 19, five railroad cars containing four reusable solid rocket booster segments and the nozzle exit cone for the Ares 1-X test rocket were assembled at Kennedy's Wilson Yard by the NASA Railroad for delivery to a rail siding within the secured area of Kennedy Space Center. The first segment was then delivered to Kennedy's Rotation, Processing and Surge Facility at Launch Complex 39 in preparation for prelaunch processing. On March 26, the rail car cover was removed and a post-arrival...
Topics: What -- Ares Launch Vehicles, Where -- Kennedy Space Center (KSC)
278
278
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 278
favorite 0
comment 0
Space shuttle Atlantis was moved Thursday, Sept. 4, from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center, Fla., for its upcoming mission to service the Hubble Space Telescope. The move is referred to as "rollout." Now that the shuttle is in launch position, Atlantis' crew will arrive at Kennedy on Sept. 21 to participate in a full launch dress rehearsal, known as the terminal countdown demonstration test, scheduled for Sept. 22-24. Atlantis is targeted...
83
83
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 83
favorite 0
comment 0
STS-127/Endeavour Window Replacement
Topic: What -- STS-127
54
54
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 54
favorite 0
comment 0
STS-127 JEM EF Lift to Weight and CG Test Stand
Topics: What -- STS-127, What -- Japanese Experiment Module (Kibo)
153
153
Jun 15, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 153
favorite 0
comment 0
Space Shuttle Atlantis' seven crew members spent two days at NASA's Kennedy Space Center in Florida preparing for their upcoming mission to upgrade the Hubble Space Telescope. On April 2, crew members participated in equipment and procedure familiarization training at the Hazardous Payload Processing Facility. The astronauts received refresher training on countdown and emergency escape procedures at Kennedy's Launch Pad 39A on April 3. Atlantis is targeted to launch on its STS-125 servicing...
88
88
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 88
favorite 0
comment 0
D. Lance Rogers III, Kennedy Space Center, Age 25. Aerospace Technologist in KSC's Enginnering Directorate. NASA co-op from 2004-2008. Full time employee starting the beginning of 2008. Graduate of Auburn University with BS in Electrical Engineering. Resides in Orlando.
Topic: Where -- Kennedy Space Center (KSC)
180
180
Jun 29, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 180
favorite 0
comment 0
In the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla., technicians attach the external fuel tank and two solid rocket boosters on Aug. 3 for space shuttle Atlantis' STS-125 mission to service the Hubble Space Telescope. Atlantis is targeted to launch on Oct. 8 at 1:34 a.m. EDT.
183
183
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 183
favorite 0
comment 0
Ares 1-X Bird Cage Weigh Test
Topic: What -- Ares Launch Vehicles
70
70
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 70
favorite 0
comment 0
STS-129 CMG Lift to Workstand
Topic: What -- STS-129
115
115
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 115
favorite 0
comment 0
LCROSS Centaur Arrival and Offload
Topics: What -- Centaur, What -- Lunar Crater Observation and Sensing Satellite (LCROSS)
99
99
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 99
favorite 0
comment 0
STS-125 SRB/ET Stack Move from High Bay 1 to High Bay 3 with Time Lapse
59
59
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 59
favorite 0
comment 0
94
94
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 94
favorite 0
comment 0
STS-125 Atlantis Roll Back to VAB
168
168
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 168
favorite 0
comment 0
Ares 1-X Aft Skirt Move to Test Building
Topic: What -- Ares Launch Vehicles
138
138
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 138
favorite 0
comment 0
The seven-member crew of the next shuttle mission practice driving the M-113 armored personnel carrier during a full launch dress rehearsal, known as the terminal countdown demonstration test, or TCDT, at NASA's Kennedy Space Center, Fla., Sept. 22. The crew members of space shuttle Atlantis' STS-125 mission each practice driving the M-113 in turn as part of their training on emergency egress procedures. An M-113 will be available to transport the crew to safety in the event of a contingency on...
220
220
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 220
favorite 0
comment 0
144
144
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 144
favorite 0
comment 0
Ares 1-X 5SS Aft Move from Astrotech to the VAB
Topic: What -- Ares Launch Vehicles
219
219
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 219
favorite 0
comment 0
Ares 1-X Roll Control System Installation
Topic: What -- Ares Launch Vehicles
78
78
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 78
favorite 0
comment 0
STS-128 Bench Review
Topic: What -- STS-128
179
179
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 179
favorite 0
comment 0
NASA/KSC Wildlife Wild Pigs and Ospray
255
255
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 255
favorite 0
comment 0
The Atlas V first stage for the Lunar Reconnaissance Orbiter (LRO) and the Lunar Crater Observation and Sensing Satellite (LCROSS) mission was moved on April 27 from its hangar to the Vertical Integration Facility at Launch Complex 41 at Cape Canaveral Air Force Station, Fla. The Centaur upper stage followed on April 30 for stacking atop the Atlas rocket. Launch preparations now will begin for a liftoff targeted for no earlier than June 2. The Lunar Reconnaissance Orbiter will orbit the poles...
Topics: What -- Atlas, What -- Crater, What -- Centaur, What -- Moon
53
53
Jul 27, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 53
favorite 0
comment 0
STS-130 Cupola move to Workshop, SSPF
Topic: What -- STS-130
65
65
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 65
favorite 0
comment 0
118
118
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 118
favorite 0
comment 0
Lift to first stage for STSS
106
106
Jun 30, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 106
favorite 0
comment 0
STS-125 Atlantis Payload Bay Door Closure in the Orbiter Processing Facility-1
203
203
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 203
favorite 0
comment 0
Space shuttle Atlantis was moved Monday, March 23, from its Orbiter Processing facility to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla., for its upcoming servicing mission to the Hubble Space Telescope. The move from Atlantis' hanger is referred to as a "rollover." Following rollover, technicians in the Vehicle Assembly Building attach the lifting sling to Atlantis for rotating and hoisting. The shuttle then is mated to its external fuel tank and twin solid...
163
163
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 163
favorite 0
comment 0
Technicians in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida attach the lifting sling to space shuttle Atlantis for rotation and hoisting on March 23. The shuttle then was attached to its external fuel tank and twin solid rocket boosters for its upcoming mission to service NASA's Hubble Space Telescope.
66
66
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 66
favorite 1
comment 0
LRO High Grain Antenna Moved to Closed Position and Hoist LRO into Integration Fixture
Topic: What -- Lunar Reconnaissance Orbiter (LRO)
245
245
Aug 21, 2009
08/09
by
NASA/Kennedy Space Center
movies
eye 245
favorite 0
comment 0
Ares 1-X Catenary Wire Installation
Topics: What -- Ares Launch Vehicles, What -- WIRE
145
145
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 145
favorite 0
comment 0
Ares 1-X 5SS Forward Mate to Center
Topic: What -- Ares Launch Vehicles
161
161
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 161
favorite 0
comment 0
Ares 1-X LAS Lift and Mate to Crew Module
Topics: What -- Ares Launch Vehicles, What -- Launch Abort System (LAS)
3,011
3.0K
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 3,011
favorite 1
comment 0
72
72
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 72
favorite 0
comment 0
At the Astrotech payload processing facility near NASA's Kennedy Space Center on April 19, the solar arrays were attached to the Lunar Reconnaissance Orbiter, or LRO. This set of three arrays will provide power to the spacecraft as it orbits the poles of the moon during a survey and mapping mission lasting up to five years. LRO is targeted to launch no earlier than June 2.
Topics: What -- Moon, What -- Lunar Reconnaissance Orbiter (LRO), Where -- Kennedy Space Center (KSC)
64
64
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 64
favorite 0
comment 0
In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the upper stage simulator segments are being prepared for the test flight identified as Ares 1-X in July 2009. The upper stage simulator comprises 11 segments, each approximately 18 feet in diameter. The segments will simulate the mass and the outer mold line. The upper stage accounts for nearly one-quarter of the total height of the Ares 1. It will take the Ares 1 on the second phase of its journey from Earth,...
Topics: What -- Ares Launch Vehicles, What -- Earth, Where -- Kennedy Space Center (KSC), Where -- Florida
432
432
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 432
favorite 0
comment 0
Technicians in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida attached the lifting sling to space shuttle Endeavour for rotation and hoisting on April 10. The shuttle then was attached to its external fuel tank and twin solid rocket boosters for its upcoming mission to the International Space Station. Endeavour also will stand by at Kennedy's launch Pad 39B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to...
Topics: What -- Space Shuttle Orbiter, What -- Endeavour, What -- International Space Station (ISS), What...
171
171
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 171
favorite 0
comment 0
STS-126 Post Launch SRB Refurbishment
Topic: What -- STS-126
228
228
Jun 11, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 228
favorite 0
comment 0
The crew that will launch aboard space shuttle Atlantis on its upcoming STS-125 mission participated in a crew equipment interface test, known as CEIT, July 11 through 12 at NASA's Kennedy Space Center, Fla. During the training, the crew inspected hardware and flight equipment they will use in orbit. During its 11-day mission, Atlantis' seven astronauts will install two new instruments to NASA's Hubble Space Telescope, as well as replace the Fine Guidance Sensor and perform other repair tasks....
Topic: STS-125
89
89
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 89
favorite 0
comment 0
STS-128 Material Science Rack
Topic: What -- STS-128
186
186
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 186
favorite 0
comment 0
64
64
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 64
favorite 0
comment 0
STS-125/Atlantis Crew Arrival for Flight
438
438
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 438
favorite 0
comment 0
NASA's Kennedy Space Center managers paid tribute to the crews of Apollo 1 and space shuttles Challenger and Columbia, as well as other NASA colleagues, during the agency's Day of Remembrance observance on Jan. 29. Kennedy Center Director and former astronaut Bob Cabana, Kennedy Deputy Center Director Janet Petro and United Space Alliance Vice President of Launch and Recovery Systems and Florida Site Executive Mark Nappi took part in a wreath-laying ceremony at the Kennedy Space Center Visitor...
Topics: What -- Space Shuttle Orbiter, What -- Challenger, What -- Columbia, What -- Discovery, Where --...
72
72
Jun 16, 2009
06/09
by
NASA/Kennedy Space Center
movies
eye 72
favorite 0
comment 0
93
93
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 93
favorite 0
comment 0
Ares 1-X 5SS Center Move to VAB
Topic: What -- Ares Launch Vehicles
199
199
Jul 25, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 199
favorite 0
comment 0
Ares 1-X Progress
Topic: What -- Ares Launch Vehicles
320
320
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 320
favorite 0
comment 0
At NASA's Kennedy Space Center in Florida, Mobile Launcher Platform, or MLP-1, rolled from Launch Pad 39B to the Vehicle Assembly Building on April 13. With MLP-1 now in the VAB's High Bay 3, preparations can begin for stacking of NASA's Ares 1-X rocket for its flight test this summer.
Topics: What -- Ares Launch Vehicles, Where -- Kennedy Space Center (KSC), Where -- Florida
69
69
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 69
favorite 0
comment 0
LRO/LCROSS Booster Arrival and Offload
Topics: What -- Lunar Crater Observation and Sensing Satellite (LCROSS), What -- Lunar Reconnaissance...
118
118
Jul 24, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 118
favorite 0
comment 0
Ares 1-X Decal Application
Topic: What -- Ares Launch Vehicles
54
54
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 54
favorite 0
comment 0
STS-127 Seda Mast Deployment, SSPF
Topic: What -- STS-127
170
170
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 170
favorite 0
comment 0
NASA's Lunar Crater Observation and Sensing Satellite, or LCROSS, arrived in Florida on Feb. 19. It will be prepared for flight at Astrotech Space Operations facility in Titusville, near Kennedy Space Center. The satellite's mission is one of the first steps in NASA's plan to return astronauts to the moon. The primary mission of LCROSS is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. Launch is targeted for this spring.
Topics: What -- Crater, What -- Moon, Where -- Florida, Where -- Kennedy Space Center (KSC)
80
80
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 80
favorite 0
comment 0
STS-127 Orbiter CEIT
Topic: What -- STS-127
133
133
Jul 28, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 133
favorite 1
comment 0
STS-129 Express Logistic Carrier Arrival/Offload Wash Down SSPF to Work Stand
Topic: What -- STS-129
79
79
Aug 24, 2009
08/09
by
NASA/Kennedy Space Center
movies
eye 79
favorite 0
comment 0
STS-127 Endeavour ELM-ES Lift to Cargo Element Work Stand
Topics: What -- STS-127, What -- Endeavour
577
577
Jul 25, 2009
07/09
by
NASA/Kennedy Space Center
movies
eye 577
favorite 0
comment 0
On Launch Pad 39B at NASA's Kennedy Space Center in Florida, a crane completes construction of one of the towers in the new lightning protection system for the Constellation Program and Ares/Orion launches. Each of the three new lighting towers will be 500 feet tall with an additional 100-foot fiberglass mast atop supporting a wire catenary system. This improved lightning protection system allows for the taller height of the Ares 1 rocket compared to the space shuttle. Pad 39B will be the site...
Topics: What -- Space Shuttle Orbiter, What -- Constellation, What -- WIRE, What -- Ares Launch Vehicles,...