Skip to main content

Kennedy Space Center Media Services Video Collection



rss RSS

135
RESULTS


Show sorted alphabetically

Show sorted alphabetically

SHOW DETAILS
up-solid down-solid
eye
Title
Date Archived
Creator
NASA Images
Aug 24, 2009 NASA/Kennedy Space Center
movies

eye 81

favorite 0

comment 0

STS-127 Endeavour ELM-ES Lift to Cargo Element Work Stand
Topics: What -- STS-127, What -- Endeavour
NASA Images
Aug 24, 2009 NASA/Kennedy Space Center
movies

eye 361

favorite 0

comment 0

Ares 1-X SM/SA Stack Move to Stand
Topic: What -- Ares Launch Vehicles
NASA Images
Aug 22, 2009 NASA/Kennedy Space Center
movies

eye 181

favorite 0

comment 0

The external fuel tank for space shuttle Atlantis' STS-125 mission to repair and upgrade NASA's Hubble Space Telescope now is at Kennedy Space Center for launch preparations. External Tank 130 arrived at Kennedy Dec. 3 and was taken off its transport barge, Pegasus, and moved into the Vehicle Assembly Building Dec. 4. The tank was then lifted into a checkout cell in the VAB on Dec. 5 to begin preparations for launch. The tank and twin solid rocket boosters will be attached to Atlantis next year...
NASA Images
Aug 21, 2009 NASA/Kennedy Space Center
movies

eye 191

favorite 0

comment 0

The full-scale mock-up of NASA's Orion crew module is being tested in the water off the coast of Kennedy Space Center in Florida the week of April 6. The spacecraft mock-up traveled from the Naval Surface Warfare Center's Carderock Division in Bethesda, Md., to Kennedy. The goal of the operation, dubbed the Post-landing Orion Recovery Test, or PORT, is to determine what kind of motion astronauts can expect after landing, as well as outside conditions for recovery teams.
Topics: What -- Orion, Where -- Kennedy Space Center (KSC), Where -- Florida
NASA Images
Aug 21, 2009 NASA/Kennedy Space Center
movies

eye 56

favorite 0

comment 0

ML Barge and Offload
NASA Images
Aug 21, 2009 NASA/Kennedy Space Center
movies

eye 196

favorite 0

comment 0

The sound suppression water system on Mobile Launcher Platform No. 1 (MLP-1) was tested April 6 at Pad 39-B. The system was modified for the Ares 1-X launch planned for later this year. MLP-1 will next be moved by the crawler transporter to the Vehicle Assembly Building to begin the stacking of the Ares 1-X flight test vehicle.
Topic: What -- Ares Launch Vehicles
NASA Images
Aug 21, 2009 NASA/Kennedy Space Center
movies

eye 245

favorite 0

comment 0

Ares 1-X Catenary Wire Installation
Topics: What -- Ares Launch Vehicles, What -- WIRE
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 1,949

favorite 1

comment 0

VAB Doors Opening with Time Lapse
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 289

favorite 2

comment 0

Kennedy Space Center and Cape Canaveral Weather and Beauty Shots
Topic: Where -- Kennedy Space Center (KSC)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 171

favorite 0

comment 0

STS-126 Post Launch SRB Refurbishment
Topic: What -- STS-126
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 119

favorite 0

comment 0

Lift to first stage for STSS
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 186

favorite 0

comment 0

KSC Family Day
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 116

favorite 0

comment 0

LCROSS Centaur Arrival and Offload
Topics: What -- Centaur, What -- Lunar Crater Observation and Sensing Satellite (LCROSS)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 99

favorite 0

comment 0

NASA and the Washington Nationals teamed up for a day of preseason baseball and exploration education March 1. Hundreds of fans were on hand to watch the Nationals take on the Baltimore Orioles at Space Coast Stadium in Viera, Fla. They also had the opportunity to visit a booth at the game where personnel from NASA's Kennedy Space Center answered questions and provided educational material about the agency's space exploration program, aeronautics research and scientific discoveries.
Topics: What -- Opportunity, Where -- Washington, Where -- Kennedy Space Center (KSC)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 51

favorite 0

comment 0

LRO Solar Ray Installation
Topic: What -- Lunar Reconnaissance Orbiter (LRO)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 70

favorite 0

comment 0

LRO/LCROSS Booster Arrival and Offload
Topics: What -- Lunar Crater Observation and Sensing Satellite (LCROSS), What -- Lunar Reconnaissance...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 89

favorite 0

comment 0

Attach Solid Rocket Motors to Delta IV
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 89

favorite 0

comment 0

D. Lance Rogers III, Kennedy Space Center, Age 25. Aerospace Technologist in KSC's Enginnering Directorate. NASA co-op from 2004-2008. Full time employee starting the beginning of 2008. Graduate of Auburn University with BS in Electrical Engineering. Resides in Orlando.
Topic: Where -- Kennedy Space Center (KSC)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 439

favorite 0

comment 0

NASA's Kennedy Space Center managers paid tribute to the crews of Apollo 1 and space shuttles Challenger and Columbia, as well as other NASA colleagues, during the agency's Day of Remembrance observance on Jan. 29. Kennedy Center Director and former astronaut Bob Cabana, Kennedy Deputy Center Director Janet Petro and United Space Alliance Vice President of Launch and Recovery Systems and Florida Site Executive Mark Nappi took part in a wreath-laying ceremony at the Kennedy Space Center Visitor...
Topics: What -- Space Shuttle Orbiter, What -- Challenger, What -- Columbia, What -- Discovery, Where --...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 220

favorite 0

comment 0

Bob Cabana B-Roll
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 61

favorite 0

comment 0

During Reboost Ops
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 257

favorite 0

comment 0

The Atlas V first stage for the Lunar Reconnaissance Orbiter (LRO) and the Lunar Crater Observation and Sensing Satellite (LCROSS) mission was moved on April 27 from its hangar to the Vertical Integration Facility at Launch Complex 41 at Cape Canaveral Air Force Station, Fla. The Centaur upper stage followed on April 30 for stacking atop the Atlas rocket. Launch preparations now will begin for a liftoff targeted for no earlier than June 2. The Lunar Reconnaissance Orbiter will orbit the poles...
Topics: What -- Atlas, What -- Crater, What -- Centaur, What -- Moon
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 3,012

favorite 1

comment 0

Astronaut Suit Demo
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 98

favorite 0

comment 0

NASA's Lunar Reconnaissance Orbiter, or LRO, spacecraft arrived in Florida on Feb. 13 and was transported to a payload processing facility at the Astrotech Space Operations facility in Titusville to being preparations for launch. The spacecraft's solar arrays were deployed and checked out for flight on Feb. 15. The satellite's mission is one of the first steps in NASA's plan to return astronauts to the moon. LRO will spend at least one year in a low polar orbit on its primary exploration...
Topics: What -- Moon, What -- Polar, Where -- Florida
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 65

favorite 0

comment 0

First stage erection
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 39

favorite 0

comment 0

Goes-O Arrival and Uncanning
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 157

favorite 1

comment 0

LRO/LCROSS High Gain Antenna Gimble Test and Stowage
Topics: What -- Lunar Crater Observation and Sensing Satellite (LCROSS), What -- Lunar Reconnaissance...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 74

favorite 0

comment 0

At the Astrotech payload processing facility near NASA's Kennedy Space Center on April 19, the solar arrays were attached to the Lunar Reconnaissance Orbiter, or LRO. This set of three arrays will provide power to the spacecraft as it orbits the poles of the moon during a survey and mapping mission lasting up to five years. LRO is targeted to launch no earlier than June 2.
Topics: What -- Moon, What -- Lunar Reconnaissance Orbiter (LRO), Where -- Kennedy Space Center (KSC)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 67

favorite 1

comment 0

LRO High Grain Antenna Moved to Closed Position and Hoist LRO into Integration Fixture
Topic: What -- Lunar Reconnaissance Orbiter (LRO)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 67

favorite 0

comment 0

LRO Blacklight Inspection/Move to Workstand
Topic: What -- Lunar Reconnaissance Orbiter (LRO)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 110

favorite 0

comment 0

STS-127 Endeavour External Tank Mated to Solid Rocket Boosters
Topics: What -- STS-127, What -- Endeavour
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 57

favorite 0

comment 0

Fairing Installation
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 54

favorite 0

comment 0

Goes-O Thermal Blanket Inspection and Space Craft Rotate to Vertical
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 170

favorite 0

comment 0

NASA's Lunar Crater Observation and Sensing Satellite, or LCROSS, arrived in Florida on Feb. 19. It will be prepared for flight at Astrotech Space Operations facility in Titusville, near Kennedy Space Center. The satellite's mission is one of the first steps in NASA's plan to return astronauts to the moon. The primary mission of LCROSS is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. Launch is targeted for this spring.
Topics: What -- Crater, What -- Moon, Where -- Florida, Where -- Kennedy Space Center (KSC)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 67

favorite 0

comment 0

STS-127 Endeavour Payload SEDA/MAXI/ICS
Topics: What -- STS-127, What -- Endeavour
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 80

favorite 0

comment 0

STS-127 Orbiter CEIT
Topic: What -- STS-127
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 64

favorite 0

comment 0

STS-127 Discovery Payload CEIT
Topics: What -- STS-127, What -- Discovery
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 65

favorite 0

comment 0

STS-127 Endeavour CEIT-Jem Exposed Facility
Topics: What -- STS-127, What -- Endeavour, What -- Japanese Experiment Module (Kibo)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 70

favorite 0

comment 0

Delta IV Goes-O Fairing Decal Installation
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 71

favorite 0

comment 0

Goes-O Spacecraft Rotation
Topic: What -- GOES-O
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 180

favorite 0

comment 0

NASA/KSC Wildlife Wild Pigs and Ospray
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 434

favorite 0

comment 0

Technicians in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida attached the lifting sling to space shuttle Endeavour for rotation and hoisting on April 10. The shuttle then was attached to its external fuel tank and twin solid rocket boosters for its upcoming mission to the International Space Station. Endeavour also will stand by at Kennedy's launch Pad 39B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to...
Topics: What -- Space Shuttle Orbiter, What -- Endeavour, What -- International Space Station (ISS), What...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 79

favorite 0

comment 0

STS-127 Rollout to 39-B
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 519

favorite 0

comment 0

The final major components of Japan Aerospace Exploration Agency's Kibo laboratory arrived at NASA Kennedy Space Center's Shuttle Landing Facility from Japan on Sept. 24. The Kibo Exposed Facility and the Experiment Logistics Module Exposed Section will fly on space shuttle Endeavour's STS-127 mission to the International Space Station. Endeavour is targeted to launch May 15, 2009.
Topics: What -- Japanese Experiment Module (Kibo), What -- Space Shuttle Orbiter, What -- STS-127, What --...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 135

favorite 1

comment 0

STS-129 Express Logistic Carrier Arrival/Offload Wash Down SSPF to Work Stand
Topic: What -- STS-129
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 329

favorite 0

comment 0

The external fuel tank for space shuttle Endeavour's STS-127 mission to the International Space Station now is at Kennedy Space Center for launch preparations. ET-131 arrived at Kennedy Feb. 21 and was taken off its transport barge, Pegasus, and moved into the Vehicle Assembly Building. The tank then was lifted into a checkout cell on Feb. 23 to begin preparations for launch. The tank and twin solid rocket boosters will be attached to Endeavour for a targeted lift off in June.
Topics: What -- Space Shuttle Orbiter, What -- STS-127, What -- International Space Station (ISS), What --...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 54

favorite 0

comment 0

STS-127 JEM EF Lift to Weight and CG Test Stand
Topics: What -- STS-127, What -- Japanese Experiment Module (Kibo)
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 178

favorite 0

comment 0

Two elements of the Japan Aerospace Exploration Agency's Kibo laboratory arrived at NASA's Kennedy Space Center, Fla., on Sept. 24, 2008, to begin processing for flight. The exposed facility and the experiment logistics module-exposed section traveled from Japan to Kennedy via a Russian Antonov-124 aircraft. The exposed facility is a unique platform that will be located outside the pressurized module and will contain Earth observation and materials science experiments. The logistics exposed...
Topics: What -- Japanese Experiment Module (Kibo), What -- Earth, What -- International Space Station...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 62

favorite 0

comment 0

STS-127 Payload CEIT
Topic: What -- STS-127
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 65

favorite 0

comment 0

STS-130 Endeavour Crew Members Inspect Cupola Hardware
Topics: What -- STS-130, What -- Endeavour
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 218

favorite 1

comment 0

The external fuel tank for space shuttle Discovery's STS-128 mission to the International Space Station now is at NASA's Kennedy Space Center in Florida for launch preparations. ET-132 arrived at Kennedy May 7 and was taken off its transport barge, Pegasus, and moved into Kennedy's Vehicle Assembly Building. The tank then was lifted into a checkout cell. The tank and twin solid rocket boosters will be attached to Discovery for targeted liftoff Aug. 6.
Topics: What -- Space Shuttle Orbiter, What -- STS-128, What -- International Space Station (ISS), What --...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 54

favorite 0

comment 0

STS-127 Seda Mast Deployment, SSPF
Topic: What -- STS-127
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 639

favorite 1

comment 0

Following rollout of space shuttle Endeavour from the Vehicle Assembly Building to Launch Pad 39B on April 17, two shuttles were on the launch pads at the same time at NASA's Kennedy Space Center, Fla. Shuttle Atlantis already had been moved to Launch Pad 39A. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during Atlantis' upcoming mission to upgrade NASA's Hubble Space Telescope. Atlantis is targeted to launch May 12. With the space shuttle fleet set...
Topics: What -- Space Shuttle Orbiter, What -- Endeavour, What -- Atlantis, What -- Hubble Space Telescope...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 408

favorite 0

comment 0

Space shuttle Endeavour was moved April 10, from Orbiter Processing Facility Bay 2 to the Vehicle Assembly Building at NASA's Kennedy Space Center, Fla., for its upcoming STS-127 mission to the International Space Station. Endeavour also will stand by at Kennedy's Launch Pad 39B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to upgrade NASA's Hubble Space Telescope. The move from Endeavour's hangar is referred to referred to as a...
Topics: What -- Space Shuttle Orbiter, What -- Endeavour, What -- STS-127, What -- International Space...
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 84

favorite 0

comment 0

STS-127/Endeavour Window Replacement
Topic: What -- STS-127
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 86

favorite 0

comment 0

STS-128/Discovery T2 Treadmill in SSPF
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 71

favorite 0

comment 0

STS-128 Engine Removal in OPF-3
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 79

favorite 0

comment 0

STS-128 Bench Review
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 63

favorite 0

comment 0

STS-128 Orbiter Boom Installation
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 90

favorite 0

comment 0

STS-128 Material Science Rack
Topic: What -- STS-128
NASA Images
Jul 28, 2009 NASA/Kennedy Space Center
movies

eye 71

favorite 0

comment 0

STS-129 CMG Lift to Workstand
Topic: What -- STS-129
NASA Images
Jul 27, 2009 NASA/Kennedy Space Center
movies

eye 111

favorite 0

comment 0

STS-130 Cupola, Windows on the Universe
NASA Images
Jul 27, 2009 NASA/Kennedy Space Center
movies

eye 53

favorite 0

comment 0

STS-130 Cupola move to Workshop, SSPF
Topic: What -- STS-130
NASA Images
Jul 27, 2009 NASA/Kennedy Space Center
movies

eye 66

favorite 0

comment 0

STS-130 Crew Inspects Cupola
Topic: What -- STS-130
NASA Images
Jul 27, 2009 NASA/Kennedy Space Center
movies

eye 150

favorite 0

comment 0

Astronauts (STS-130) George Zamka and Kathryn Hire in promo for CBS Sports. NCAA Army vs. Navy, 3 takes.
Topics: Who -- Kathryn Hire, What -- STS-130
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 660

favorite 4

comment 0

Time Lapse Pad 39B Tower Construction
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 322

favorite 0

comment 0

On March 19, five railroad cars containing four reusable solid rocket booster segments and the nozzle exit cone for the Ares 1-X test rocket were assembled at Kennedy's Wilson Yard by the NASA Railroad for delivery to a rail siding within the secured area of Kennedy Space Center. The first segment was then delivered to Kennedy's Rotation, Processing and Surge Facility at Launch Complex 39 in preparation for prelaunch processing. On March 26, the rail car cover was removed and a post-arrival...
Topics: What -- Ares Launch Vehicles, Where -- Kennedy Space Center (KSC)
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 183

favorite 0

comment 0

Mobile Launch Platform #1 Media Handout
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 580

favorite 0

comment 0

On Launch Pad 39B at NASA's Kennedy Space Center in Florida, a crane completes construction of one of the towers in the new lightning protection system for the Constellation Program and Ares/Orion launches. Each of the three new lighting towers will be 500 feet tall with an additional 100-foot fiberglass mast atop supporting a wire catenary system. This improved lightning protection system allows for the taller height of the Ares 1 rocket compared to the space shuttle. Pad 39B will be the site...
Topics: What -- Space Shuttle Orbiter, What -- Constellation, What -- WIRE, What -- Ares Launch Vehicles,...
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 200

favorite 0

comment 0

Ares 1-X Progress
Topic: What -- Ares Launch Vehicles
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 100

favorite 0

comment 0

Testing of New Bridge Crane in the O and C
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 167

favorite 0

comment 0

On Launch Pad 39B at NASA's Kennedy Space Center in Florida, a crane removes the lightning mast from the fixed service structure. The mast was used to protect the space shuttle from lightning while at the pad. The new lightning protection systems being built for the Constellation Program and Ares/Orion launches allows for the taller height of the Ares 1 rocket compared to the space shuttle. Pad 39B will be the site of the first Ares vehicle launch, the Ares 1-X test flight, that is targeted for...
Topics: What -- Space Shuttle Orbiter, What -- Constellation, What -- Ares Launch Vehicles, Where --...
NASA Images
Jul 25, 2009 NASA/Kennedy Space Center
movies

eye 235

favorite 0

comment 0

NASA's Kennedy Space Center and Lockheed Martin Corp. hosted a ceremony on Jan. 26 to mark the completion of renovations to the historic Operations and Checkout Building high bay for use by the Constellation Program. Originally built to process space vehicles in the Apollo era, the building will serve as the final assembly facility for the Orion crew exploration vehicle.
Topics: What -- Constellation, What -- Orion, Where -- Kennedy Space Center (KSC)
NASA Images
Jul 24, 2009 NASA/Kennedy Space Center
movies

eye 173

favorite 0

comment 0

On Launch Pad 39B at NASA's Kennedy Space Center in Florida, a crane completes construction of the third and final tower in the new lightning protection system for the Constellation Program and Ares/Orion launches. Each of the three lightning towers will be 500 feet tall with an additional 100-foot fiberglass mast atop supporting a wire catenary system. This improved lightning protection system allows for the taller height of the Ares 1 rocket compared to the space shuttle. Pad 39B will be the...
Topics: What -- Space Shuttle Orbiter, What -- Constellation, What -- WIRE, What -- Ares Launch Vehicles,...
NASA Images
Jul 24, 2009 NASA/Kennedy Space Center
movies

eye 263

favorite 0

comment 0

Time Lapse Pad 39B Tower Construction Short Version