Skip to main content

Space Shuttle Gallery



rss RSS

3
RESULTS


A B C D remove-circle E F G H I J K L M N O P Q R S T U V W X Y Z
SHOW DETAILS
up-solid down-solid
eye
Title
Date Archived
Creator
A/V Geeks
movies

eye 2,345

favorite 3

comment 1

Demonstrates how the tethered satellite and the Space Shuttle orbiter interact with Earth's magnetic field to produce an electric current. Future applications of the tethered satellite/Space Shuttle orbiter system as a motor are described. To license this film and get a higher quality version for broadcast/film purposes, contact A/V Geeks LLC .
favoritefavoritefavoritefavorite ( 1 reviews )
Topics: NASA, Liftoff to Learning, STS-75
Space Shuttle Gallery
image

eye 46

favorite 0

comment 0

The newest addition to the Space Shuttle orbiter fleet, Endeavour, arrives at KSC atop the 747 Shuttle Carrier Aircraft on May 7. OV-105 will be demated from the Boeing aircraft, and towed to the Vehicle Assembly Building for installation of several major flight components. Next step will be a lengthy stay in the Orbiter Processing Facility for a rigorous series of first flow tests. Endeavour is scheduled to lift off on its maiden space flight in 1992. Image credit: NASA May 7, 1991
Source: http://www.nasa.gov/mission_pages/shuttle/flyout/multimedia/endeavour/91-05-07-2.html
Space Shuttle Gallery
image

eye 53

favorite 0

comment 0

The Space Shuttle Endeavour lifts off from launch Pad 39A on April 9, 1994, at 7:05 a.m. EDT to begin the nine-day STS-59/Space Radar Laboratory mission. The mission countdown clock also can be seen, giving the time into the mission after liftoff. The STS-59 mission is scheduled to end with a landing at KSC's Shuttle Landing Facility. April 9, 1994 Phot credit: NASA
Source: http://www.nasa.gov/mission_pages/shuttle/flyout/multimedia/endeavour/94-04-09.html